<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Palm Beach County, FL - File #: 25-048</title><link>https://pbc.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7990474&amp;GUID=D1F3CC0B-D41F-412F-BE53-082976E48CB0</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://pbc.legistar.com/Feed.ashx?GUID=D1F3CC0B-D41F-412F-BE53-082976E48CB0&amp;ID=7990474&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Palm Beach County, FL - File #: 25-048</title><link>https://pbc.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7990474&amp;GUID=D1F3CC0B-D41F-412F-BE53-082976E48CB0</link><guid isPermaLink="false">D1F3CC0B-D41F-412F-BE53-082976E48CB0-2026-04-22-19-35-20</guid><description>Title: Motion and Title: Staff recommends motion to approve: Consultant Services Authorization (CSA) No. 4 to the Consulting/Professional Engineering Services for Master Lift Station and Repump Improvements (Contract) with AECOM Technical Services, Inc., (Consultant) for Improvements to Lift Stations 5229, 5236 and 5241 (Project) for a not to exceed amount of $787,707.01. SUMMARY: On April 20, 2021, the Board of County Commissioners (BCC) approved the Palm Beach County Water Utilities Department (PBCWUD) Contract (R2021-0508) with Consultant. CSA No. 4 provides for engineering design, permitting, and bidding services for Lift Station (LS) 5229 is the largest and most critical wastewater pumping facility within the PBCWUD system, serving as a primary conveyance point for the central region of Palm Beach County (PBC). Because of its size and importance, the station must remain in continuous operation; however, it currently lacks redundancy to allow for maintenance, emergency response, or major upgrades. To address this limitation and strengthen system reliability, PBCWUD is undertaking a coor</description><pubDate>Wed, 22 Apr 2026 19:35:20 GMT</pubDate></item></channel></rss>