File #: 25-048    Version: 1
Type: Resolution Status: Agenda Ready
File created: 4/21/2026 In control: Board of County Commissioners
On agenda: 4/27/2026 Final action:
Title: Motion and Title: Staff recommends motion to approve: Consultant Services Authorization (CSA) No. 4 to the Consulting/Professional Engineering Services for Master Lift Station and Repump Improvements (Contract) with AECOM Technical Services, Inc., (Consultant) for Improvements to Lift Stations 5229, 5236 and 5241 (Project) for a not to exceed amount of $787,707.01. SUMMARY: On April 20, 2021, the Board of County Commissioners (BCC) approved the Palm Beach County Water Utilities Department (PBCWUD) Contract (R2021-0508) with Consultant. CSA No. 4 provides for engineering design, permitting, and bidding services for Lift Station (LS) 5229 is the largest and most critical wastewater pumping facility within the PBCWUD system, serving as a primary conveyance point for the central region of Palm Beach County (PBC). Because of its size and importance, the station must remain in continuous operation; however, it currently lacks redundancy to allow for maintenance, emergency response, or major ...
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Meeting Date: Click or tap to enter a date.
Department: Click or tap here to enter text.
Submitted By: Click or tap here to enter text.
I. EXECUTIVE BRIEF
title
Motion and Title: Staff recommends motion to approve: Consultant Services Authorization (CSA) No. 4 to the Consulting/Professional Engineering Services for Master Lift Station and Repump Improvements (Contract) with AECOM Technical Services, Inc., (Consultant) for Improvements to Lift Stations 5229, 5236 and 5241 (Project) for a not to exceed amount of $787,707.01. SUMMARY: On April 20, 2021, the Board of County Commissioners (BCC) approved the Palm Beach County Water Utilities Department (PBCWUD) Contract (R2021-0508) with Consultant. CSA No. 4 provides for engineering design, permitting, and bidding services for Lift Station (LS) 5229 is the largest and most critical wastewater pumping facility within the PBCWUD system, serving as a primary conveyance point for the central region of Palm Beach County (PBC). Because of its size and importance, the station must remain in continuous operation; however, it currently lacks redundancy to allow for maintenance, emergency response, or major upgrades. To address this limitation and strengthen system reliability, PBCWUD is undertaking a coordinated program of improvements involving LS 5229, LS 5236, and LS 5241. The proposed work includes major structural, mechanical, electrical, and control system upgrades at LS 5229 to modernize aging infrastructure and improve performance and resiliency. LS 5236, which is no longer in service, will be fully decommissioned, with its wet well and dry pit filled, and site utilities reconfigured to continue supporting the existing odor control system. LS 5241 will be converted into a functional bypass facility capable of handling the full LS 5229 flow during rehabilitation, providing the redundancy needed for future maintenance and emergency operations. These improvements will enhance system capacity, operational flexibility, and l...

Click here for full text